402.434.5488

Millard West High School

K-12

The Challenge

Millard West High School’s tennis court reconstruction project was driven by the need to replace aging courts that no longer met performance or safety standards. Seeking a durable and long-lasting solution, the district opted to install post-tensioned concrete tennis courts, providing superior playability and longevity. With limited construction windows during the school year, the project required a contractor capable of managing tight timelines, multiple scopes of work, and precise coordination to deliver exceptional results without disrupting school operations.

Market

K-12

Project Scope

Earthwork

Grading

Post-tension tennis court installation

Surfacing installation

Athletic equipment

Key Facts

Nemaha successfully reconstructed the tennis courts at Millard West High School, ensuring durability, safety, and performance for student-athletes.

The project was completed within a limited timeline, with Nemaha Sports Construction managing all phases from earthwork to final surfacing to meet the school’s scheduling needs.

Challenge Met

As the general contractor, Nemaha led the project with a focus on detailed scheduling and quality control. From demolition to final surfacing, each phase was carefully coordinated to stay within the district’s timeline and budget. The team’s deep understanding of athletic facility standards ensured that all design and material selections would provide optimal performance and long-term durability.

Through proactive communication and hands-on project management, the post-tension concrete courts were delivered on time, with precision craftsmanship that met both athletic expectations and district requirements.

Gallery